MRK5, 2023
MRK5 File Org
Chase’s Notes
General Mitosis:
What to expect this semester:
- 2 in-person meetings:
- Call these “Test meetings”: These meetings are meant to test new design hardware or software.
- 2 online/CAD meetings:
- Call these “design sprints”
- 2 hours long, these meetings are for quick iterations. Start each meeting with a 2-hour goal, that can be completed in time for testing at the next in-person meeting.
Mechanical
Essential:
- [ ] Minimize wobble of XY riders
- [ ] Refine and perfect bearings
- [ ] Perfect bed-adjustment screws— No creep, but easy to turn.
- [ ] 3D printed BL Touch/bed-leveling Sensor
- [ ] Perfect Ball-bearing for leadscrews
Extensions, High Priority:
- [ ] Adjustable Angle Nozzle
- [ ] Epoxy Toolhead (could make the build tray)
- [ ] Tool-changer mechanism
- [ ] Injection Molding nozzle (For Mitostruder)
- [ ] Mitostruder
Extensions, Lower Priority:
- [ ] CNC/Sander tool head.
- [ ] Pipe/tube extruder.
Extensions, No Priority:
- [ ] Strain-gauge for auto-calibrating XYZ distance moved per step. (note: resistance changes over time)
- [ ] Robot Arm-Printer interface for assembly
Personal Goals:
- Rhea:
- Get the toolhead by mid-February, print it, and see how it works.
- Hiking
- Chase:
- Z-axis by the end of January
- See who else is returning
Electrical
Essential:
Complete Printer PCB
Complete mitostruder PCB
Complete printer electrical connections
Software
Essential:
Complete PCB firmware
Mitostruder slicer modifications
Tasks
Chase:
- CAD Revamp:
- Bearings
- Assembly
- Templates/Naming
- Refine Bearings?
- Bed Leveling Sensor
- Improve end stops (rider)
- linear ballscrew
- Adjustable angle nozzle
- tool changer mechanism
- mitostruder